- An ariel view of the school grounds prior to the addition of the Play and Learn Daycare.
- June 16. 2015 Hon. Don Morgan
- Sod Turning
- Sod Turning Ceremony
- July 2013
- View along 1st avenue- July, 2015
- View from the south side of the construction site. July 2015
- Construction of the Practical and Applied Arts Space- Sept. 17, 2015
- PAA space as of Sept. 27.
- September 28, 2015
- September 29
- Sept. 30
- October 1st from 1st Avenue
- October 1st
- October 7
- October 13
- October 13, 2015
- October 15- Concrete being poured.
- October 22- Roof is coming along.
- October 22
- October 29
- October 29 – cement being poured.
- November 5th
- November 5- roof of PAA space coming along.
- November 5
- November 10
- November 10
- November 10
- November 10
- November 10
- November 11
- November 11
- November 11-Main entrance taking shape.
- December 1, 2015
- Dec. 1 view from 1st avenue
- January 5
- Jan.5 View from the south.
- Interior view of the resource centre.
- Jan 7 view from south (playground)
- Jan. 7
- Jan.26 North side of school
- March 3
- March 3
- March 15
- March 3
- March 3
- March 3, 2016 view of the ressource centre
- March 3- view from the inside to the south
- March 3
- March 3- view from the student entrance to the north
- March 15- view of the ressource centre
- March 15- Elevator shaft and stairs to 2nd floor from the addition.
- March 15
- March 15
- April 1st – South facing exterior
- April 1st
- April 1st- North facing exterior- main entrance
- Elevator shaft to the left.
- View from 2nd floor into addition
- April 1 – PAA Shop Door
- April 1st- South facing
- April 1st- classroom in the addition
- April 1st- classroom in the addition
- View from 2nd floor stairs -looking at the Resource Centre
- Preparing the wall for the stair case.
- Stairway leading from addition to 2nd floor
- Addition entrance looking south
- View of the addition main entrance from the north
- April 16, 2015 Washroom in primary classroom in addition.
- April 16- Classroom in the addition.
- Classroom in the addition.
- View of the Ressource Centre from the 2nd floor staircase.
- April 22 – slidiing door install in addition classroom
- Hanging lights in hall between ressource centre and primary classrooms
- Ressource Centre carpet and diagonal light fixtures.
- Photocopy room / Teacher work space.
- Classroom with lino in addition.
- Hallway from the daycare to the existing high school
- July 26
- view of the PAA shop doors from the south
- view from the playground looking north into the building
- view from first avenue – July 26
- cupboards in atrium being installed
- under the staircase
- view looking up in the atrium
- view of the ressource centre from the 2nd floor stairs
- Canteen/Kitchen cupboards
- 2nd floor sliding doors
- Water heater.
- new addition water fountains
- Admin. Assitant office at entry
- staffroom
- admin office
- Making the bus parking lot.
- future bus loop
- future side walk on north side of school
- Lowering the floor in the office.
- Removing the old tiles in the lower floor of the High School.
- Teacher work room.
- View from the lower floor to the East.
- July 26
- Stairs August 8
- August 13, 2016
- Preparing for the garage to be built. August 13
- Aug. 15- Preparing for the south sidewalks
- Aug.15 – gym work area
- Aug. 15- stage area
- Aug. 15- starting to move from GES into EGS
- Aug. 30- View from 1st avenue
- Sept. 6- Playground view
- Sept. 9- Temporary playground access
- Sept. 9- south of school playground area
- Sept 15- Resource Centre
- Sept. 26 Pouring cement for the sidewalks- October 2
- Sept. 26- View from 1st avenue